Type |
NON-TOU TARIFFS |
Facility Charge E/Month |
Energy Charge c/kWh |
Demand Charge E/kVA |
Access Charge E/Month |
S10 |
|
75.00 |
- |
- |
|
S1 |
|
80.78 |
- |
- |
|
S2 |
134.87 |
112.01 |
- |
- |
|
S3 |
134.87 |
112.01 |
- |
- |
|
S3 |
269.75 |
112.01 |
- |
- |
|
K4 |
1,195.10 |
42.49 |
71.36 |
32.08 |
|
K5 |
1,405.99 |
50.00 |
83.95 |
37.75 |
|
K6 |
1,405.99 |
50.00 |
83.95 |
37.75 |
TOU TARIFFS |
T1 |
T2 |
T3 |
T4 |
TOU at MV at HV network |
TOU at MV |
TOU at LV |
TOU small irrigation < 100 kVA |
|
Facility Charge E/month |
3261.33 |
1569.62 |
1180.74 |
1003.63 |
Demand Charge E/kVA |
76.32 |
79.95 |
83.95 |
71.36 |
Access Charge E/kVA |
37.58 |
39.38 |
37.74 |
35.14 |
Energy – Low Demand - Peak c/kWh |
77.80 |
79.92 |
81.33 |
70.22 |
Energy – Low Demand - Standard c/kWh |
55.32 |
56.76 |
57.73 |
50.16 |
Energy – Low Demand - Off-Peak c/kWh |
44.61 |
45.73 |
46.48 |
40.59 |
Energy – High Demand - Peak c/kWh |
221.43 |
228.07 |
232.49 |
197.63 |
Energy – High Demand - Standard c/kWh |
67.85 |
69.89 |
71.25 |
60.56 |
Energy – High Demand - Off-Peak c/kWh |
44.61 |
45.73 |
46.48 |
40.59 |
Most tariffs will carry a suffix which describes the type of application for which the customer uses the electricity. This does not change the tariff rates but is for statistical purposes.
Application descriptions |
|
f |
Irrigation and farming |
d |
Industrial |
c |
Large Commercial |


Coordinates:
PO Box 258
Tel: (00268) 2 409 4000
Fax: (00268) 2 404 2335
Email: